







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateFast, Reliable ADU Builders Across Spring
If you’re searching for ADU Builders who know Spring’s MUD districts, setback rules, and permit process, you’ve found the right crew. A detached ADU in Spring typically runs $185,000 – $320,000 depending on size, site conditions, and whether your MUD requires a separate water meter or wastewater tap. That’s the honest range, and we’ll give you a written line-item price before any work begins. Call (361) 326-2313 to schedule a free estimate at your Spring property.

We’re Lodgewick ADU Houston, the ADU company of the Kingswell family. Our crews work in Spring neighborhoods every week, from Birnam Wood off Rayford Road to Cypresswood and the subdivisions along Cypresswood Drive. We know which MUDs require early coordination, which easements run through older lots, and what the Harris County inspectors look for on framing day. A lodge, for what it’s worth, is a small house on a larger property. That’s exactly what an ADU is, and it’s all we build.
Why Lodgewick ADU Houston Is Spring’s Preferred ADU Builders Company

Russ Delmar leads our Spring work, and he’s spent enough time in Harris County MUD territory to know that the first question on a detached ADU isn’t square footage. It’s whether the water and sewer tap capacity even allows the build. That early coordination saves Spring homeowners $3,000 – $8,000 in surprise fees that show up when a builder skips the MUD check and discovers the problem after demolition starts.
Our Spring customers keep bringing us back for one reason: the Kingswell Guarantee. Written price first. Real arrival window. Clean job site. Written guarantee on every project, with a free return visit if anything fails within 365 days. That’s the 365-Day Done Right Promise, and we deliver it in writing before the first nail is driven. Background-checked, uniformed technicians on every Spring job site, and a live person answers our phones 24/7. No voicemail loops when you have a question about your build.
We arrived in 2010 as part of the Kingswell family of home-service companies, and since then we’ve worked with Spring homeowners who’ve been burned before by a price that changed at the door or a contractor who never showed. We don’t do that. Written price, always, before any work starts.
ADU Construction in Spring
ADU Construction in Spring means building a permitted accessory dwelling unit on a lot that already has a primary residence, and in this area that process starts with the MUD review, not the floor plan. A typical Spring ADU construction project runs $185,000 – $320,000 depending on size, finishes, and site constraints. The biggest cost driver in Spring specifically is site work: MUD tap fees, easement constraints, and the soil conditions in older subdivisions can add $10,000 – $20,000 to the foundation and utility phase alone.
MUD Coordination and Permitting
Unlike Houston proper, much of Spring lies within Harris County MUD service areas where water and wastewater tap capacity and distance-to-main rules frequently dictate whether a detached ADU is even plumbable. This is a make-or-break step that does not exist in neighboring Montgomery County portions of The Woodlands. We contact the MUD before we finalize a price, because the MUD’s tap fee and meter requirements belong in your written estimate, not as a change order six weeks in.
Construction Calendar Expectations
A Spring ADU takes four to seven months from permit submittal to final inspection, and the MUD review can add two to four weeks to the permitting phase. If you want occupancy by the holidays, we need signed plans by early summer. Russ Delmar maps this calendar out for every Spring homeowner before we sign anything, so you always know what “done” looks like.
Detached ADU in Spring
Detached ADU in Spring is the most common request we get from homeowners who want a fully separate structure in the rear yard rather than a garage conversion. A detached ADU in Spring typically runs $210,000 – $320,000 for a 600 – 1,000 sq ft unit, and that range reflects the cost drivers that are unique to this area: rear-yard easement widths in older subdivisions, MUD tap requirements, and fire separation rules when the structure sits within 10 feet of the main house.
Setback and Easement Reality Checks
Crews sometimes pour a slab before confirming the rear-yard easement width in older Spring subdivisions like Cypresswood, and that forces a tear-out when the county spots an encroachment. In the Birnam Wood subdivision off Rayford Road, our crew framed a 749 sq ft detached ADU for a homeowner tied to a MUD with a 150-foot sewer lateral limit. We re-routed the drain line through a side-yard easement and switched to a low-profile Dvele panel package to keep the foundation within the required 10-foot rear setback, clearing the MUD inspection on the first pass.

Fire Separation and Foundation Planning
Spring enforces fire separation requirements for detached ADUs under 10 feet from the main house, and a standard Houston permit checklist often misses this entirely. That stalls the framing inspection. We build that requirement into the plans from day one, and we mark it on the contract so you see exactly what the inspector will check before we start framing.
Trusted Brands We Service in Spring
We work with established ADU brands and materials matched to your Spring lot, budget, and timeline. Dvele packages work well on the narrow setbacks we see in older Spring subdivisions, and we’ve used Mighty Buildings and Plant Prefab panels on Spring projects where site access ran tight. We keep local material relationships that let us turn around revisions quickly for Spring customers, and we’ll tell you honestly which brand fits your lot instead of steering you toward whichever manufacturer we happen to stock in the yard that month.
Common ADU Builders Problems We See in Spring Homes
- MUD tap surprises after demolition starts. Builders quote a flat per-square-foot price without checking whether the MUD requires a new water meter or separate wastewater tap, and the homeowner gets hit with $3,000 – $8,000 in fees mid-project. We check this before we price the job.
- Easement encroachments discovered after the slab is poured. Older Spring subdivisions like Cypresswood have rear-yard easements that vary by lot, and a slab set three feet over the line means a tear-out. We confirm easement widths before we order concrete.
- Fire separation missed on the permit set. A checklist from Houston often lacks Spring’s specific fire separation requirements for detached ADUs within 10 feet of the primary residence, and the framing inspection stalls. We include this in every Spring plan set.
- MUD review timed wrong. Waiting until after the architect finishes drawings to contact the MUD adds four to six weeks to permitting. We contact the MUD as soon as the site plan exists, because the tap fee belongs in your written price.
Pricing for ADU Builders in Spring, TX
You should not have to call just to get a ballpark. A studio ADU in Spring runs $185,000 – $230,000. A one-bedroom detached ADU runs $210,000 – $260,000. A two-bedroom unit runs $260,000 – $320,000. Site work drives most of the variation in Spring: MUD tap fees, easement width, soil conditions, and how far your sewer lateral needs to travel. Finished material choices, like James Hardie plank versus a painted fiber-cement panel, can swing the price $15,000 – $30,000. We give you a written line-item price before permits are pulled, and the only things that change that number after signing are scope changes you request or hidden site conditions we document together. Call (361) 326-2313 to schedule your free estimate.
We Also Serve Cities Near Spring
Our crews work Spring daily and regularly serve nearby homeowners in Houston, Galena Park, Channelview, and Katy. If you’re just outside the Spring city limits, call (361) 326-2313 and we’ll confirm coverage for your address.
Serving Spring, TX - Our Local Coverage Area
We’re based in the Spring area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs About ADU Builders in Spring
A MUD review is triggered whenever your proposed ADU requires a new water meter, a separate wastewater tap, or a sewer lateral extension beyond your MUD’s distance-to-main limit. In unincorporated Harris County parcels without MUD oversight, these tap capacity rules don’t apply the same way, which is why a builder who works only in Houston can miss the entire step. We contact your MUD early and put the tap fees in your written price. Call (361) 326-2313 for a free estimate that includes MUD coordination.
Four to seven months from permit submittal to final inspection, and Spring MUD review can add two to four weeks to the permit phase. If you want holiday occupancy, you need signed plans by early summer. Russ Delmar gives every Spring homeowner a written construction calendar before work begins. Call (361) 326-2313 to talk through your timeline.
Dvele’s low-profile panel package fits a 10-foot rear setback better than most, and we’ve used it on Spring lots where the easement leaves almost no room for error. Mighty Buildings and Plant Prefab also make sense on lots with tight crane access. We match the brand to your specific lot, not the other way around. Call (361) 326-2313 and we’ll walk your site.
MUD tap fees, easement encroachments, and fire separation requirements are the three triggers we see most in Spring. A builder who skips the MUD check quotes a price that holds only until the MUD demands a separate wastewater tap, and that’s $3,000 – $8,000 on top of the contract. We price these in before you sign. Call (361) 326-2313 for a written line-item estimate that accounts for all three.
Yes, and especially on a Spring ADU. James Hardie plank holds up to Gulf Coast humidity better than wood siding and stands up to the wind-driven rain we see in Spring storm seasons. The upfront cost runs $15,000 – $30,000 more than painted fiber-cement panel, but the maintenance and replacement math favors Hardie over a 20-year ownership window. Call (361) 326-2313 and we’ll price both options on your build.
Written by Russ Delmar, Owner at Lodgewick ADU Houston, serving Spring since 2010.



