A Lodgewick company - serving Houston, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Home Addition Contractor · West University Place, TX

Home Addition Contractor in West University Place - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

21+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee
Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Houston
A new sunroom addition with three walls of windows
A second-story addition that matches the existing roofline
An attached garage converted into living space
A compact kitchen inside a new ADU
A kitchenette inside a converted garage
A new modern ADU with wood cladding
A new bathroom inside a converted garage
The bedroom inside a new ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable Home Addition Contractor Across West University Place

Adding square footage to a home in West University Place is not like adding on in Katy or Sugar Land. The lots are tighter, the houses older, and the city’s deed restrictions and setback rules are some of the strictest in the Houston metro. A room addition here typically runs $180 – $320 per square foot depending on finish level, and a full bathroom addition usually lands between $65,000 and $120,000 when you factor in West U’s plumbing and foundation realities.

If you’re reading this, you probably already know the headache: you call a contractor, they give you a vague number, then the price moves once the permit review starts. We do it differently. Lodgewick ADU Houston works with West University Place homeowners under The Kingswell Guarantee: a written price before any work starts, a defined arrival window, a clean job site, and a written 365-day guarantee on every project. Call (361) 326-2313 and you’ll get a live person, not a voicemail.

Why Lodgewick ADU Houston Is West University Place’s Preferred Home Addition Contractor Company

A single-story rear room addition with tall windows and a new patio

West University Place is a fully built-out, deed-restricted enclave where every residential lot was platted before 1940. There are no greenfield parcels left. Any home addition here is a teardown-and-rebuild or a vertical/horizontal expansion within strict 25-foot front setbacks and 5-foot side setbacks that differ from neighboring Houston, which has no zoning at all. That context changes everything about how a job gets scoped, priced, and permitted.

Russ Delmar leads our team, and he’s spent years working through West U’s third-party plan review process. We know which inspections the city actually sends someone out for, what the tree survey triggers, and which questions the review board asks on rear additions versus second-story bump-outs. That knowledge keeps your permit from stalling for six extra weeks.

We’re part of the Kingswell family of home-service companies, established in 2010. Every Lodgewick location is independently owned and operated, and our Houston office dispatches crews to West University Place daily. Our technicians are background-checked and uniformed, so you always know exactly who’s walking onto your property. And when you call with a question mid-project, a live person answers. Always.

Bathroom Addition Contractor in West University Place

Bathroom Addition Contractor work in West University Place means adding a full or half bath to a house that was likely built before modern plumbing codes existed. Many of these 1930s and 1940s homes still run on cast-iron drain lines that were sized for a single bath. Adding a second or third bathroom often means the existing sanitary line cannot handle the added load without a partial replacement or a new vent stack.

What Adds the Most Cost

On a typical West U bathroom addition, the two cost drivers are foundation work and sewer connectivity. A slab foundation from 1938 does not always have the depth or reinforcement to carry a new wet wall cleanly, so we sometimes end up doing a localized underpinning or a small crawl-space tie-in. That’s $8,000 to $25,000 before you pick a single tile. If the main sewer line is in the way or undersized, add another $6,000 to $18,000 depending on how far the tap is from the street.

A Realistic Budget for West U

A straightforward three-quarter bath addition with fiberglass shower, standard vanity, and tile floor runs $65,000 to $95,000 on a slab home. A primary bath with a curbless shower, custom cabinetry, and heated floors pushes past $120,000. We give you a written line-item price before any work starts, and that number does not change at the door. Call (361) 326-2313 for a free estimate on your specific floor plan.

Bedroom Addition Contractor in West University Place

A second-story addition with a balcony, matched to the original house

Bedroom Addition Contractor projects in West University Place almost always involve either a rear ground-floor addition or a second-story bump-out over an existing wing. The city requires a minimum 9-foot plate height on any new conditioned addition, which means your roofline changes and your neighbor’s sightlines come into play. A bedroom addition here runs $150,000 to $300,000 depending on whether you’re adding a single room or a primary suite with a bath.

Second-Story Work on 1930s Frames

When we go vertical on a West U home, we have to verify what the 1930s framing can actually carry. We recently scoped a rear addition on a 5,000-square-foot lot off Rutgers Street, where our crew had to field-verify the 1938 concrete perimeter beam before tying in new footings. Once we saw the 6-inch slump at the corner, we revised the foundation plan and re-priced the pier count before the permit even cleared through the city’s third-party plan review. That kind of verification is not optional here.

Setback Math on 50-Foot Lots

A lot of West University Place lots are 50 feet wide. The 5-foot side setbacks mean your buildable width is 40 feet, minus any existing encroachments like window wells, AC pads, or fence lines. A 14-foot-wide bedroom addition works fine. A 20-foot-wide primary suite might trigger a variance, and variances in West U are slow. We tell you up front if your plan fits the envelope or needs board approval.

Trusted Brands We Service in West University Place

We work with established prefab and panelized systems including Boxabl, Plant Prefab, and Tuff Shed, along with James Hardie siding and trim for West U’s traditional architectural character. For a rear addition or garage conversion on a tight West University Place lot, a panelized build can cut framing time by two to three weeks, which matters when your permit approval alone took eight. We carry local inventory for common warranty parts and hardware so follow-up work doesn’t stall waiting on a shipment from out of state.

Common Home Addition Contractor Problems We See in West University Place Homes

  • Starting before the tree survey. The city requires a pre-permit tree survey on nearly every addition. A single 14-inch live oak in the rear yard can force a complete redesign of the addition footprint, and once you’ve already paid for plans, that re-design is on you.
  • Underestimating stormwater detention. Adding 400 square feet of impervious cover often triggers a buried 500-gallon detention vault. That’s $15,000 to $20,000 and two extra weeks of schedule, and most out-of-town contractors in West University Place don’t catch it until the city flags the permit.
  • Assuming Houston rules apply. Houston has no zoning. West U does. You cannot borrow setback logic from a job in Spring or Katy and apply it to a lot off University Boulevard. The 25-foot front setback alone kills many side-load garage addition plans.
  • Fighting old sewer lines. A 1940s cast-iron main under the slab can be in worse shape than the homeowner realizes. We’ve seen a planned $80,000 bathroom addition turn into a $110,000 project because the existing sanitary line failed inspection once it was exposed.

Pricing for Home Addition Contractor in West University Place, TX

Here are honest ranges for West University Place’s market, based on what we’ve scoped and built here. A ground-floor room addition runs $180 to $240 per square foot for standard finishes. A second-story addition runs $220 to $320 per square foot because of structural verification, roof tie-ins, and the 9-foot plate height requirement. A bathroom addition as a standalone project runs $65,000 to $120,000. A full primary suite with bath and walk-in closet runs $180,000 to $320,000. Sunroom additions start around $55,000 for a conditioned space that meets West U code, because cheap three-season rooms won’t pass review.

What moves the number: foundation condition, sewer line age, tree survey findings, stormwater detention requirements, and whether you’re in a deed-restricted section that requires specific exterior materials. We give you a written price before any work starts, and we name the 365-Day Done Right Promise in that same document. If something isn’t right, we come back and make it right. Call (361) 326-2313 to schedule your free estimate.

We Also Serve Cities Near West University Place

If you’re just outside West University Place, our Home Addition Contractor team also covers Houston, Spring, Katy, and Sugar Land. And if you want to see how we approach projects specifically in West University Place, this page is built for exactly that. The permitting rules change at every city line, and we know the difference.

Serving West University Place, TX - Our Local Coverage Area

We’re based in the West University Place area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Construction worker installing a wooden roof truss for a home addition. in West University Place, TX
Contractor installing roof trusses on a residential home addition project in West University Place, TX

FAQs About Home Addition Contractor in West University Place

What is the minimum square footage for a legal bedroom addition in West University Place?

A legal bedroom in West University Place must be at least 70 square feet with a minimum 7-foot ceiling height in at least half the room, plus a closet and an egress window. In practice, most bedrooms we build in West U are 120 to 180 square feet, because anything smaller feels cramped in a home this age. Call (361) 326-2313 and we’ll walk your floor plan through the exact code.

How far from the side property line can we build an addition on a 50-foot-wide West U lot?

Five feet. That’s the standard side setback, and it applies regardless of what neighboring Houston allows. On a 50-foot lot, that leaves you a 40-foot buildable width before you account for existing encroachments like AC condensers or fence offsets. If your plan needs to push closer than 5 feet, you’re looking at a variance, which adds review time and is never guaranteed.

Do I need a separate permit for plumbing or electrical in a West U home addition?

Yes. West University Place requires separate plumbing, electrical, and mechanical permits in addition to the building permit for the addition, and each one goes through the city’s third-party plan review. Some homeowners are surprised that a bathroom addition can involve four separate permits, but that’s the process. We handle all of them and pull them before any work starts. Call (361) 326-2313 for a permit timeline on your specific project.

Will adding a bathroom to a 1940s West U house require updating the main sewer line?

Frequently, yes. The original cast-iron lines in a 1940s West U house were sized for one or two baths and have had nearly a century to corrode. When we expose the existing line during a bathroom addition, inspection often fails it. Budget $6,000 to $18,000 for a partial or full sanitary replacement depending on distance to the tap and soil conditions. We put that line item in your written estimate, not a mystery change order.

How long does the city’s plan review actually take for a home addition in West University Place?

Plan reviews in West University Place currently run 6 to 10 weeks for a standard addition, and longer if a variance or tree survey triggers additional review. The stormwater detention calculation is often what stretches the timeline. We’ve had projects where the review cleared in five weeks and others that took twelve. We give you a realistic calendar before you sign anything.

Call Lodgewick ADU Houston for Your West University Place Addition

A framer checking new wall framing on a home addition

You don’t need to guess at the cost of a home addition in West University Place. You need a written price from someone who has actually worked within the city’s setback rules, tree survey requirements, stormwater detention mandates, and third-party review process. That’s what we do. Russ Delmar and the Lodgewick ADU Houston team will scope your addition, tell you what the permit review will flag, and put every number in writing before a single nail is driven. Call (361) 326-2313 today for a free estimate.

Written by Russ Delmar, Owner at Lodgewick ADU Houston, serving West University Place since our founding as part of the Kingswell family of home-service companies.

Why West University Place Chooses Lodgewick ADU Houston

We set the standard for home addition contractor in West University Place.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in West University Place

Getting your home addition contractor handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your home addition contractor needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in West University Place - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local home addition contractor pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What West University Place Customers Say

Trusted by homeowners across West University Place and surrounding areas.

★★★★★

"I was nervous about adding on but they walked me through every step and every cost before we started. No surprise change orders halfway through like I'd heard horror stories about."

Eleanor Pratt · Verified customer
★★★★★

"A whole backyard ADU from scratch. Terrified me going in, but they kept me updated weekly and there were no nasty surprises. Quality work and a fair price."

Noreen Fletcher · Verified customer
★★★★★

"Converted our garage into a rental studio. The crew was respectful of the neighbors and kept the site clean. It's bringing in rent now and paid for itself faster than I expected."

Grace Yoon · Verified customer

Small homes that live large

Vaulted ceilings, compact kitchens and private decks: the details that make an ADU feel like a home.

Read our ADU guides
A former garage converted into a guest houseThe living room inside a new ADUA bedroom and desk inside a converted garageA new two-story ADU over a garageThe bathroom inside a new ADUA small deck outside a new ADU

More ADU services in West University Place

Every build below starts the same way: a free site visit and a written price.

Getting started with Lodgewick in Houston

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Houston team

A local crew that works across Houston and the towns around it, to the same written standard as every Lodgewick location.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Home Addition Contractor in West University Place?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in West University Place.

(361) 326-2313

Request a Free Estimate in West University Place

Tell us about your home addition contractor needs - we'll respond within the hour.

When you submit this form, you agree to our Privacy Policy and agree that you may be contacted by telephone, text message, or email about your request, including by the independent contractors we may refer it to.

Areas We Serve
Call Now - 24/7 Dispatch